/ Renewables
Renewables
IEC 61400 / NERC CIP
IEC 61400-1, IEC 61400-22, and NERC CIP-013. The gate family is defined and ready for engagement.
THE PROVING GROUND
See the gate run on a neighboring artifact. Every part that passes carries the same verified thread.
Where the part lives or dies.
Wind turbine type certification under IEC 61400 requires structural load calculations, blade-material certifications, nacelle-assembly records, and grid-compliance documentation consolidated before the certification body review. NERC CIP adds a cybersecurity layer for grid-connected assets. One missing load-case record and the type certificate does not issue.
WHAT THE GATE RECOVERS
60 to 300 hrs
Labour a single submission consumes. About half recovered per verified package.
Toward 95%
First-pass approval rate. Production agents score the full package before it leaves your desk.
Weeks back
Per submission, recovered from review loops and re-test cycles avoided.
1 to millions
Each verified submission authorizes the parts that follow.
Roadmap
Use cases this sector displaces.
- Consolidating blade and nacelle material certifications against IEC 61400-1 load requirements
- Assembling type-certification evidence packages for certification body review
- Tracking NERC CIP supply-chain risk management records for grid-connected assets
- Flagging missing load-case documentation before turbine-class submission
START HERE
Bring one part. We run it through the gate.
Declare your part and its submission intent. We run it through the Submission Gate and hand back the verdict and the certificate. One part. One pass. Everything cited.
Today we define the certification gate. Tomorrow we bring turbines to commission.