/ Oil and Gas
Oil and Gas
API Q1 (API 6A / 6D / 16A)
API Q1, API 6A, API 6D, and API 16A. The gate family is defined and carries the highest sales velocity in our pipeline.
YOUR ARTIFACT · UNDER THE GATE
GATE CHECKS · API 6A qualification
Structural factor of safety ≥ 1.50
Hydraulic efficiency ≥ 70 % (warn < 74 %)
Wear-ring clearance 0.30–1.00 mm
Minimum wall thickness ≥ 2.0 mm
Internal tool clearance ≥ 3.0 mm
Unit-cost index ≤ 1.40 (nominal = 1.0)
Where the part lives or dies.
In oil and gas, API spec conformance is the barrier to procurement. Pressure-test records, material traceability, and third-party inspection certificates must align against the purchase order spec before a wellhead component ships. One traceability gap and the order does not clear.
WHAT THE GATE RECOVERS
60 to 300 hrs
Labour a single submission consumes. About half recovered per verified package.
Toward 95%
First-pass approval rate. Production agents score the full package before it leaves your desk.
Weeks back
Per submission, recovered from review loops and re-test cycles avoided.
1 to millions
Each verified submission authorizes the parts that follow.
Roadmap
Use cases this sector displaces.
- Running API spec conformance checks against purchase order requirements
- Reconciling material traceability records from mill cert to finished component
- Validating pressure-test records against rated working pressure specs
- Flagging third-party inspection gaps before the document package reaches the operator
START HERE
Bring one part. We run it through the gate.
Declare your part and its submission intent. We run it through the Submission Gate and hand back the verdict and the certificate. One part. One pass. Everything cited.
Today we define the gate. Tomorrow we run it with you.