/ Mining
Mining
MSHA 30 CFR / IECEx
MSHA 30 CFR Part 18, IECEx IEC 60079, and ISO 13849. The gate family is defined and ready for engagement.
THE PROVING GROUND
See the gate run on a neighboring artifact. Every part that passes carries the same verified thread.
Where the part lives or dies.
Mining equipment deployed in gassy or dusty environments must carry MSHA approval under 30 CFR Part 18 or Part 19, and IECEx certification for equipment intended for explosive atmospheres in international markets. Approval documentation, intrinsic-safety calculations, and surface-temperature test records must be consolidated before equipment is permitted underground.
WHAT THE GATE RECOVERS
60 to 300 hrs
Labour a single submission consumes. About half recovered per verified package.
Toward 95%
First-pass approval rate. Production agents score the full package before it leaves your desk.
Weeks back
Per submission, recovered from review loops and re-test cycles avoided.
1 to millions
Each verified submission authorizes the parts that follow.
Roadmap
Use cases this sector displaces.
- Assembling MSHA approval documentation packages against 30 CFR Part 18 requirements
- Cross-checking intrinsic-safety circuit parameters against IECEx certification limits
- Tracking surface-temperature test records for explosive-atmosphere equipment
- Flagging approval documentation gaps before underground equipment deployment
START HERE
Bring one part. We run it through the gate.
Declare your part and its submission intent. We run it through the Submission Gate and hand back the verdict and the certificate. One part. One pass. Everything cited.
Today we define the approval gate. Tomorrow we certify safe extraction.