/ Construction
Construction
EN 1090 / ACI 318
EN 1090-2, ACI 318, and ISO 3834. The gate family is defined and ready for engagement.
THE PROVING GROUND
See the gate run on a neighboring artifact. Every part that passes carries the same verified thread.
Where the part lives or dies.
Structural steel fabrication under EN 1090 requires an Execution Class assessment, welder qualifications, welding procedure specifications, and dimensional inspection records assembled before CE marking of the steel structure. ACI 318 governs reinforced concrete design on the North American side. Buyer fragmentation makes this sector a deliberate commission play.
WHAT THE GATE RECOVERS
60 to 300 hrs
Labour a single submission consumes. About half recovered per verified package.
Toward 95%
First-pass approval rate. Production agents score the full package before it leaves your desk.
Weeks back
Per submission, recovered from review loops and re-test cycles avoided.
1 to millions
Each verified submission authorizes the parts that follow.
Roadmap
Use cases this sector displaces.
- Assembling EN 1090 Execution Class documentation packages for CE-marking review
- Cross-checking welder qualification records against welding procedure specification assignments
- Tracking dimensional inspection records from fabrication through erection
- Flagging weld-procedure gaps before structural steel delivery to site
START HERE
Bring one part. We run it through the gate.
Declare your part and its submission intent. We run it through the Submission Gate and hand back the verdict and the certificate. One part. One pass. Everything cited.
Today we define the fabrication gate. Tomorrow we build what stands.