/ Aerospace
Aerospace
FAI (AS9102)
AS9102 Rev C and AS9100D. The FAI gate is structured and ready for activation.
YOUR ARTIFACT · UNDER THE GATE
GATE CHECKS · AS9102 FAI
Structural factor of safety ≥ 1.50
Blade-root stress ≤ 880 MPa (Ti-6Al-4V allowable)
Minimum wall thickness ≥ 2.0 mm
Internal tool clearance ≥ 3.0 mm
Unit-cost index ≤ 1.40 (nominal = 1.0)
AS9100 headline gate
Where the part lives or dies.
In aerospace, the First Article Inspection Report is the airworthiness handshake. Every characteristic must be accounted for, every balloon called out, every measurement traceable. One missed line and the gate does not close.
WHAT THE GATE RECOVERS
60 to 300 hrs
Labour a single submission consumes. About half recovered per verified package.
Toward 95%
First-pass approval rate. Production agents score the full package before it leaves your desk.
Weeks back
Per submission, recovered from review loops and re-test cycles avoided.
1 to millions
Each verified submission authorizes the parts that follow.
Registered
Roadmap
Use cases this sector displaces.
- Generating first-article inspection reports from raw measurement data
- Cross-checking characteristic accountability against design requirements
- Carrying airworthiness evidence in a single traceable package
- Flagging balloon numbering gaps before the FAIR reaches the customer DER
START HERE
Bring one part. We run it through the gate.
Declare your part and its submission intent. We run it through the Submission Gate and hand back the verdict and the certificate. One part. One pass. Everything cited.
Today we structure your FAI. Tomorrow we design what it certifies.